Paris — Here’s a look at work planned in Fannin and Grayson Counties during the week of Jan. 7, 2019. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motoristsare advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.
Sherman Area (Fannin, Grayson Counties)
FM 691, Grayson County: from FM 131/Loy Lake Rd. to US 75. Watch for temporary one-lane closures as workers begin construction on widening FM 691 to an ultimate 5 lane roadway. The intersection of FM 691 with FM 131/Loy Lake Road will be temporarily converted to a four-way stop at the beginning of the project and will become a signalized intersection at the conclusion of construction.
FM 1417, Grayson County: from FM 691 to US 82. Watch for traffic shifts and slow moving vehicles as workers widen the roadway from FM 691 to US 82.
US 75 Ramp Reversal in Denison, Grayson County: on the southbound US 75 main lanes and frontage road between FM 120 and Crawford Street. Watch for shoulder closures and lane shifts as workers work on constructing the retaining walls for this project. The southbound US 75 exit ramp for Crawford Street is closed and traffic wishing to use this exit should use the FM 120 (Morton Street) exit.
US 75 Ramp Reversal in Sherman, Grayson County: on the northbound US 75 main lanes and frontage road between Choctaw Creek and FM 1417. Watch for shoulder closures and lane shifts on the main lanes and a left lane closure on the frontage road as workers work on constructing the new exit ramp and entrance ramp. The existing ramps will remain open during construction of the new ramps.
US 75 Full Depth concrete repair, Grayson County: crews will be working on southbound US 75 weather permitting each week from Sunday night thru Thursday night. Lane closures will be present during the nighttime only in order for crews to replace failed concrete locations. Lane closures begin at 7:30 pm and all lanes should be reopened by 6:00 am.
US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile operations as workers pick up debris from the roadway every Monday, Wednesday, and Friday during the day-time.
SH 11, Grayson and Fannin County: from US 69 to SH 121. Watch for traffic shifts and occasional one-lane closures as workers rehab and widen the roadway.
ADA Curb Ramp project, Grayson and Fannin County: various locations. Watch for shoulder closures and occasional lane closures as crews work in Honey Grove to install new sidewalks and curb ramps along SH 56 and FM 100. Crews are also working in Bonham on Loop 205 installing sidewalks and curb ramps.
US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow-moving construction equipment as crews work on widening US 82 from a two-lane roadway to a four-lane divided section. Watch for lane closures on SH 78 and SH 121 as crews work to construct the new westbound US 82 bridge overpasses.
FM 1752, Fannin County: from US 82 to FM 898. Watch for temporary one-lane closures as workers rehab and widen the roadway.
FM 816 & Recreation Road 3, Fannin County: from Fannin-Hunt County line to SH 78 on FM 816, and from FM 273 eastward for two miles on Rec. Road 3 south of Lake Bonham. Watch for temporary lane closures as workers install safety treatments on fixed objects.
CR 4526 at Tributary to Bois D’arc Creek, Fannin County: CR 4131 at Cooper Creek is closed as crews work on replacing the bridge.